
15 Dezember 2014 zurück zu den Nachrichten
Pezzolato plant with Spanner Re2 module: 3873 h in 6 months!!
The Pezzolato turnkey plants PG 50 with Spanner Re2 module, installed at a customer, is producing excellent results. In fact, at 6 months after the activation are 3873 the operating hours for a total of 170008 kWh products.
Please find in attached a picture of the car with the reporting of hours and kWh electrical products.