NEWS


23 enero 2015 volver a las news

New PEZZOLATO PG 100 cogeneration plant


In recent days, a new Pezzolato PG 100 wood chip cogeneration plant has been put into operation. The plant, located in a Tuscan farmhouse, is composed of two SPANNER RE2 gasification modules connected to the Pezzolato EPG 100 wood chip pre-treatment module with drying system (monitored by software) and chip screening system for the separation of the fine part and of the oversized large pieces so as to have an efficient and reliable system.

For more information, please visit our PG 100 PLANTS website at the following address: https://pezzolato.it/en/machine/pg-100-plants/

volver a las news


Últimas noticias


Pezzolato acogió la reunión anual de…
Los días 6 y 7 de junio, tuvimos el placer de acoger en nuestras instalaciones a un grupo de directivos…

17 junio 2024
PEZZOLATO TLC 2024: HISTORIA E INNOVACIÓN…
Pezzolato S.p.A., desde hace casi 50 años en el diseño, producción y comercialización de maquinaria para la producción de leña,…

4 marzo 2024
PEZZOLATO EN AGRITECHNICA 2023: FIABILIDAD E…
Pezzolato vuelve a AGRITECHNICA con un importante espacio expositivo: Halle 26 - Stand B22 enteramente dedicado a la presentación de…

30 octubre 2023