NEWS


7 juin 2017 retour aux news

A TUTTO SYNGAS: 16.349 HOURS OF OPERATION IN TWO YEARS


Pezzolato PG50 cogeneration plant reaches 16349 hours of operation in two years of life.

The correct design of the designers, the precise installation and commissioning of the Pezzolato technicians together with the excellent management and maintenance of the customer have enabled the PG50 “turnkey” cogeneration plant, activated on 24/04/2015, to reach the 16349 hours of operation  99% of the nominal electric power with a total of 728.348 kWh electrical products and placed on the network.

The computer screen of the system that highlights the details  of the hours of operation as indicated above 

The complete plant consists of a PTH PEZZOLATO CIPPATORE , a PEZZOLATO CIPPED DRYING AND VAGLIATURA  e  A SPANNER RE2 GASIFICATION PLANT. 

At present, 35 Pezzolato cogeneration plants in Italy and the UK are in operation, of which 7 are nearing completion and commissioning. To get more details on the systems of the PG50, PG100 and PG200 series made and operating throughout Italy click here

retour aux news


Dernières news


Pezzolato a accueilli la réunion annuelle…
Les 6 et 7 juin, nous avons eu le plaisir d'accueillir dans nos établissements un groupe de responsables d'entreprises membres…

17 juin 2024
ALL ROAD DE PEZZOLATO: LES SOLUTIONS…
Performance, dynamisme et fiabilité sont les caractéristiques qui distinguent les « haut de gamme » quel que soit le secteur…

25 mars 2024
PEZZOLATO TLC 2024: HISTORIQUE ET INNOVATION…
Pezzolato S.p.A. developpe, construit et commercialise des machines pour la production de bois de chauffage depuis plus de 50 ans.…

4 mars 2024