NEWS


27 avril 2016 retour aux news

AT FULL synGAS


Pezzolato PG 50 cogeneration plant reaches 8279 hours of operation in the first year of life.

The proper designers’s design, the precise Pezzolato technicians’ installation and commissioning combined with an excellent customer’s management and maintenance enabled “turnkey” PG50 cogeneration plant, activated the 04/24/2015, to reach the 8279 hours of operation at 99% of the nominal electric power with a total of 369 243 electric kWh products and placed on the network.

The cogeneration plant’s computer screen that shows the details of the hours of operation.

 

The complete cogeneration system consists of a PEZZOLATO PTH DRUM WOOD CHIPPER, a PEZZOLATO DRYING AND SCREENING WOOD CHIPS SYSTEM AND A SPANNER RE2 GASIFICATION PLANT.

 

PTo get more details on PG50, PG100 and PG200 cogeneration plants manufactured by Pezzolato and working throughout Italy https://pezzolato.it/en/machine/pg-50-plants/

retour aux news


Dernières news


VOUS AVEZ BESOIN DE COPEAUX DE…
CRIBLE A TROMMEL PEZZOLATO L 4000 Le L 4000 est le crible a trommel de chez Pezzolato dédié au criblage…

17 janvier 2025
LIVRER DU BOIS DE CHAUFFAGE SANS…
DÉCOUVREZ LE CRIBLE PEZZOLATO RS11 ! Les clients qui souhaitent acheter du bois de chauffage de qualité sont de moins…

11 décembre 2024
PEZZOLATO @ EIMA 2024: THANK YOU…
We would like to thank you, once again, for visiting our stand during EIMA. The number of contacts and opportunities…

12 novembre 2024