NEWS


27 avril 2016 retour aux news

AT FULL synGAS


Pezzolato PG 50 cogeneration plant reaches 8279 hours of operation in the first year of life.

The proper designers’s design, the precise Pezzolato technicians’ installation and commissioning combined with an excellent customer’s management and maintenance enabled “turnkey” PG50 cogeneration plant, activated the 04/24/2015, to reach the 8279 hours of operation at 99% of the nominal electric power with a total of 369 243 electric kWh products and placed on the network.

The cogeneration plant’s computer screen that shows the details of the hours of operation.

 

The complete cogeneration system consists of a PEZZOLATO PTH DRUM WOOD CHIPPER, a PEZZOLATO DRYING AND SCREENING WOOD CHIPS SYSTEM AND A SPANNER RE2 GASIFICATION PLANT.

 

PTo get more details on PG50, PG100 and PG200 cogeneration plants manufactured by Pezzolato and working throughout Italy https://pezzolato.it/en/machine/pg-50-plants/

retour aux news


Dernières news


Pezzolato a accueilli la réunion annuelle…
Les 6 et 7 juin, nous avons eu le plaisir d'accueillir dans nos établissements un groupe de responsables d'entreprises membres…

17 juin 2024
ALL ROAD DE PEZZOLATO: LES SOLUTIONS…
Performance, dynamisme et fiabilité sont les caractéristiques qui distinguent les « haut de gamme » quel que soit le secteur…

25 mars 2024
PEZZOLATO TLC 2024: HISTORIQUE ET INNOVATION…
Pezzolato S.p.A. developpe, construit et commercialise des machines pour la production de bois de chauffage depuis plus de 50 ans.…

4 mars 2024