NEWS


7 Juni 2017 zurück zu den Nachrichten

A TUTTO SYNGAS: 16.349 HOURS OF OPERATION IN TWO YEARS


Pezzolato PG50 cogeneration plant reaches 16349 hours of operation in two years of life.

The correct design of the designers, the precise installation and commissioning of the Pezzolato technicians together with the excellent management and maintenance of the customer have enabled the PG50 “turnkey” cogeneration plant, activated on 24/04/2015, to reach the 16349 hours of operation  99% of the nominal electric power with a total of 728.348 kWh electrical products and placed on the network.

The computer screen of the system that highlights the details  of the hours of operation as indicated above 

The complete plant consists of a PTH PEZZOLATO CIPPATORE , a PEZZOLATO CIPPED DRYING AND VAGLIATURA  e  A SPANNER RE2 GASIFICATION PLANT. 

At present, 35 Pezzolato cogeneration plants in Italy and the UK are in operation, of which 7 are nearing completion and commissioning. To get more details on the systems of the PG50, PG100 and PG200 series made and operating throughout Italy click here

zurück zu den Nachrichten


Letzte Neuigkeiten


Pezzolato war Gastgeber des Jahrestreffens von…
Am 6. und 7. Juni hatten wir das Vergnügen, eine Gruppe von Managern der Mitgliedsunternehmen von Chaleur Bois Qualitè Plus,…

17 Juni 2024
PEZZOLATO TLC 2024: GESCHICHTE UND INNOVATION…
Pezzolato S.p.A. ist seit fast 50 Jahren in der Entwicklung, Herstellung und Vermarktung von Maschinen für die Brennholzproduktion tätig und…

15 März 2024
PEZZOLATO HACKERTRUCK: SCHNELLE LIEFERUNG UND MAßGESCHNEIDERTE…
Pezzolato bietet eine revolutionäre Formel für Hochleistungshacker an, die schnelle Lieferzeiten mit der Möglichkeit der individuellen Anpassung des Fahrzeugs verbindet.…

2 Februar 2024