NEWS


27 April 2016 back to news

AT FULL synGAS


Pezzolato PG 50 cogeneration plant reaches 8279 hours of operation in the first year of life.

The proper designers’s design, the precise Pezzolato technicians’ installation and commissioning combined with an excellent customer’s management and maintenance enabled “turnkey” PG50 cogeneration plant, activated the 04/24/2015, to reach the 8279 hours of operation at 99% of the nominal electric power with a total of 369 243 electric kWh products and placed on the network.

The cogeneration plant’s computer screen that shows the details of the hours of operation.

 

The complete cogeneration system consists of a PEZZOLATO PTH DRUM WOOD CHIPPER, a PEZZOLATO DRYING AND SCREENING WOOD CHIPS SYSTEM AND A SPANNER RE2 GASIFICATION PLANT.

 

PTo get more details on PG50, PG100 and PG200 cogeneration plants manufactured by Pezzolato and working throughout Italy https://pezzolato.it/en/machine/pg-50-plants/

back to news


Latest News


NEW TRADE SHOW APPOINTMENT IN VERMONT…
After the exceptional appreciation received from sector professionals met during the Expo Richmond in Virginia, Pezzolato USA will also be…

18 April 2024
MEET PEZZOLATO @ EXPO RICHMOND TRADE…
Pezzolato, a historic Italian company and a leading manufacturer of high-performance industrial firewood plants, will be meeting with customers and…

10 April 2024
PEZZOLATO ALL ROAD: THE SOLUTIONS THAT…
Pezzolato’s ALL ROAD fully embodies performance, dynamism and reliability, the typical characteristics that distinguish best sellers in any sector. These…

25 March 2024