NEWS


27 abril 2016 volver a las news

AT FULL synGAS


Pezzolato PG 50 cogeneration plant reaches 8279 hours of operation in the first year of life.

The proper designers’s design, the precise Pezzolato technicians’ installation and commissioning combined with an excellent customer’s management and maintenance enabled “turnkey” PG50 cogeneration plant, activated the 04/24/2015, to reach the 8279 hours of operation at 99% of the nominal electric power with a total of 369 243 electric kWh products and placed on the network.

The cogeneration plant’s computer screen that shows the details of the hours of operation.

 

The complete cogeneration system consists of a PEZZOLATO PTH DRUM WOOD CHIPPER, a PEZZOLATO DRYING AND SCREENING WOOD CHIPS SYSTEM AND A SPANNER RE2 GASIFICATION PLANT.

 

PTo get more details on PG50, PG100 and PG200 cogeneration plants manufactured by Pezzolato and working throughout Italy https://pezzolato.it/en/machine/pg-50-plants/

volver a las news


Últimas noticias


Pezzolato acogió la reunión anual de…
Los días 6 y 7 de junio, tuvimos el placer de acoger en nuestras instalaciones a un grupo de directivos…

17 junio 2024
PEZZOLATO TLC 2024: HISTORIA E INNOVACIÓN…
Pezzolato S.p.A., desde hace casi 50 años en el diseño, producción y comercialización de maquinaria para la producción de leña,…

4 marzo 2024
PEZZOLATO EN AGRITECHNICA 2023: FIABILIDAD E…
Pezzolato vuelve a AGRITECHNICA con un importante espacio expositivo: Halle 26 - Stand B22 enteramente dedicado a la presentación de…

30 octubre 2023