10 février 2017 retour aux news
Activation of 200 kW cogeneration plant
Last December, a “turnkey” PG 200 cogeneration plant was activated.
The complete plant is able to produce 200 kW / h of woody biomass electricity and consists of:
– a Pezzolato drying and screening system model EPG200 for the preparation of woody biomass
– 4 Spanner Re2 gasifiers and 4 Spanner Re2 cogenerators equipped with the new 8-liter aspirated engine
– a Pezzolato chipper model PTH 900 M
– a hydraulic and electric system designed by Pezzolato technicians and built on site according to customer needs.
For more information on our wood chips drying and sieving plants and cogeneration plants you can consult the ENERGY WORKING section on our website at:
https://pezzolato.it/it/pezzolato-energia/la-gassificazione-0